The Distribution Network Operator (DNO) is the company responsible for the electricity cables and infrastructure that deliver power to your home. When you install solar panels, the DNO needs to know about your system because you’re no longer just consuming electricity – you’re also generating it and potentially exporting it back to the grid.

For most residential solar installations, DNO involvement is straightforward: your installer simply notifies the DNO after installation, and no approval is required. For larger systems, a formal application and approval process is needed before installation can begin. Understanding how this process works helps set realistic expectations and ensures your installation proceeds smoothly.

This guide explains what DNOs do, why they’re involved in solar installations, how the notification and approval processes work, typical timelines, what can cause delays, and how to ensure your application succeeds.

DNO Approval at a Glance

What is a DNO?Company managing local electricity network
Why involved?Solar exports power to their network
Small systems (≤3.68kW)Notification only – no approval needed
Larger systems (>3.68kW)Formal application and approval required
Who submits?Your MCS installer
Cost to you?Usually nothing

What Is a DNO?

DNO Role

ResponsibilityDetails
Own infrastructureCables; substations; transformers
Maintain networkRepairs; upgrades; safety
Deliver electricityFrom transmission to homes
Manage connectionsNew supplies; generation
Network planningCapacity; future needs

DNO vs Energy Supplier

DNOEnergy Supplier
Owns the wiresSells the electricity
Maintains infrastructureBills you monthly
Regional monopolyYou can switch
Approves connectionsPays for your export (SEG)
Examples: UKPN; WPD; NPGExamples: Octopus; EDF; British Gas

UK DNO Regions

DNOAreas Covered
UK Power Networks (UKPN)London; South East; East of England
National Grid (formerly WPD)Midlands; South West; Wales
Electricity North West (ENW)North West England
Northern Powergrid (NPG)North East; Yorkshire
SP Energy NetworksCentral/South Scotland; North Wales; Merseyside
Scottish and Southern (SSEN)North Scotland; Central Southern England

Finding Your DNO

MethodHow
Electricity billShows distribution charges
MPAN numberFirst two digits indicate area
ENA postcode checkerenergynetworks.org
Ask your installerThey’ll identify it

G98 and G99 are the formal Engineering Recommendations published by the Energy Networks Association, the trade body for the UK’s electricity and gas network operators. They replaced the older G83 and G59 standards in 2019 and are the documents your installer’s compliance work is measured against.

Why DNO Involvement Matters

Network Safety

ConcernWhy Important
Voltage regulationExport can raise local voltage
Cable capacityInfrastructure has limits
Transformer loadingCan’t exceed ratings
Safety isolationEngineers need to know generation exists

Network Capacity

IssueConsequence
Too much local generationVoltage rises too high
Reverse power flowNetwork designed for one-way
Transformer overloadEquipment damage risk
Cable thermal limitsOverheating risk

Why Small Systems Are Simpler

FactorExplanation
Limited export3.68kW won’t stress network
Self-consumptionMuch used on-site
DiversityNot all exporting simultaneously
Historical dataNetwork tolerates this level

G98: Notification Process

What G98 Covers

AspectDetails
System sizeUp to 3.68kW per phase
Single phaseUp to 3.68kW
Three phaseUp to 11.04kW total
Process typeNotification – not application
Approval needed?No

G98 Timeline

StageWhenWho
System installedDay 1Installer
System commissionedDay 1Installer
Notification submittedWithin 28 daysInstaller
DNO acknowledgesUsually automaticDNO
Added to databaseAfter notificationDNO

What’s in a G98 Notification

InformationPurpose
Installation addressIdentify location
MPAN (supply number)Link to supply point
System capacitykW rating
Inverter detailsMake; model; G98 compliance
Commissioning dateWhen connected
Installer MCS numberCertification verification

G98 Submission Methods

MethodDetails
Online portalDNO’s website – most common
MCS databaseAuto-notifies some DNOs
Email formSome DNOs accept
Bulk uploadFor installers doing many

G99: Application Process

What G99 Covers

AspectDetails
System sizeAbove 3.68kW per phase
Single phaseAbove 3.68kW
Three phaseAbove 11.04kW total
Process typeFormal application
Approval needed?Yes – before installation

G99 Application Stages

StageDescriptionTimeline
1. ApplicationSubmit to DNODay 0
2. ValidationDNO checks completeness5 working days
3. AssessmentTechnical evaluationUp to 45 working days
4. Connection offerTerms and conditionsAfter assessment
5. AcceptanceCustomer accepts offerWithin 90 days
6. Pre-connectionAny required worksVariable
7. InstallationSystem installedAfter approval
8. CommissioningFinal connectionMay need witness

For a step-by-step walkthrough of preparing and submitting a G99 application – including what each form looks like and which DNO portals work best – see our companion DNO solar application guide.

Application Documentation

DocumentContents
Application formSite details; contact info
Single line diagramElectrical schematic
Inverter datasheetTechnical specifications
G99 complianceProtection settings
Site planLocation of equipment
Installer credentialsMCS certification

What DNO Assesses

CheckPurpose
Network capacityCan local network accept export?
Voltage impactWill voltage stay within limits?
Fault levelImpact on protection systems
Thermal capacityCable and transformer loading
Protection settingsG99 compliance

Connection Offer

Types of Offer

Offer TypeMeaning
UnconditionalConnect at full capacity; no constraints
ConditionalConnect with conditions/limitations
CurtailmentExport may be limited at times
Reinforcement requiredNetwork upgrade needed first

Offer Contents

ItemDetails
Connection capacityApproved export limit
Connection pointWhere you connect
Technical requirementsProtection settings; equipment
Any conditionsLimitations; requirements
Costs (if any)Connection charges
Validity periodHow long to accept

Accepting the Offer

StepAction
Review termsUnderstand conditions
Sign acceptanceFormal agreement
Pay any feesIf required
Within validityUsually 90 days

Timelines in Detail

Regulatory Timescales

StageTarget Time
Application validation5 working days
Connection offer (simple)45 working days
Connection offer (complex)65 working days
Offer validity90 days

Real-World Timescales

ScenarioTypical Duration
Simple approval6-8 weeks
Standard assessment8-12 weeks
Complex assessment12-16 weeks
Constraints identified16-26 weeks
Reinforcement needed6-18 months

What Causes Delays

CauseImpact
Incomplete applicationReturned; resubmit
Missing documentsClock stops until provided
Complex assessment neededExtended timeline
Network constraintsAdditional studies
High application volumeDNO backlog
Reinforcement designEngineering work

Network Capacity

Checking Capacity

MethodDetails
DNO heat mapsOnline capacity maps
Pre-application enquiryAsk DNO before applying
Installer experienceKnow local issues
Neighbour experienceOthers installed nearby?

Constraint Types

ConstraintCause
Voltage constraintToo much local generation
Thermal constraintCables/transformer at limit
Fault levelProtection coordination
Reverse power flowNetwork design limits

High Constraint Areas

Area TypeWhy Constrained
RuralLong cable runs; weak network
End of lineDistance from transformer
High solar uptakeMany existing systems
Old infrastructureLimited capacity

Possible Outcomes

G99 Application Results

OutcomeWhat It Means
Approved – unconditionalFull capacity; no restrictions
Approved – export limitedCapped export capacity
Approved – curtailmentMay be limited at peak times
Requires reinforcementNetwork upgrade needed
DeferredQueue for capacity
RefusedCannot connect at requested capacity

If Export Limited

OptionConsideration
Accept limitProceed with reduced export
Add batteryStore excess rather than export
Reduce system sizeMatch approved capacity
Appeal/negotiateDiscuss with DNO

For the technical detail of how export limiting actually works – and why it’s increasingly the default approach for systems just over the G98 threshold – see our guide to export limitation. If you’re considering battery storage as a way to soak up curtailed export, our battery retrofit guide covers the practicalities.

If Reinforcement Required

AspectDetails
What it meansNetwork upgrade before connection
CostMay be charged to you
TimelineMonths; potentially years
AlternativeAccept lower capacity instead

Costs

G98 Costs

ItemCost
NotificationFree
DNO assessmentN/A – not required
ConnectionFree – existing supply
Total DNO cost£0

G99 Costs

ItemTypical Range
Application feeUsually free; up to £300
AssessmentUsually included
Connection (simple)Often £0
WitnessingIf required: £200-500
ReinforcementIf needed: £100s-£10,000s

Who Pays What

CostTypically Paid By
Application/assessmentUsually covered by DNO
Simple connectionUsually free
Minor reinforcementOften shared
Major reinforcementCustomer or shared

Commissioning

G98 Commissioning

AspectDetails
DNO attendanceNot required
WitnessNot required
TestingInstaller performs
DocumentationInstaller provides

G99 Commissioning

AspectDetails
DNO witnessingMay be required
When requiredUsually larger systems
BookingArrange with DNO
CostMay be charged
Testing witnessedProtection settings verified

Commissioning Documents

DocumentPurpose
G98/G99 formConfirms compliance
Test resultsProtection settings verified
Electrical certificateBS 7671 compliance
As-built diagramFinal configuration

Your Installer’s Role

What Installer Does

TaskDetails
Determine standardG98 or G99?
Prepare applicationTechnical documentation
Submit to DNOThrough proper channels
Respond to queriesAdditional information
Accept offerOn your behalf or with you
Arrange commissioningBook witnessing if needed
Submit completionFinal notification

Your Role

TaskDetails
Provide MPANFrom electricity bill
Confirm supply typeSingle or three phase
Sign if requiredSome applications need signature
Accept offerMay need your approval
Pay feesIf any apply

If you’re using a quote-comparison process to find an installer, make sure DNO application handling is explicitly included in the price – some cheaper quotes leave it as the homeowner’s responsibility. Our solar quote checker walks through what should be itemised in a compliant quote.

Different DNO Processes

Portal Variations

DNOOnline System
UKPNG99 online portal
National Grid (WPD)Connection portal
Northern PowergridOnline application
ENWSelf-service portal
SP NetworksConnection portal
SSENOnline services

DNO Performance

MetricVariation
Processing timesVary by DNO; workload
Portal usabilityDifferent quality
CommunicationVaries in responsiveness
FeesSlight variations

Troubleshooting

Common Problems

ProblemSolution
Application rejectedCheck missing info; resubmit
Taking too longChase via portal/phone
Capacity refusedRequest lower capacity or limit
High reinforcement costReduce capacity; use export limit
DNO non-responsiveEscalate; contact Ofgem if serious

Avoiding Delays

ActionBenefit
Complete applicationNo back-and-forth
Correct documentationPasses validation
Check capacity firstAvoid surprises
Experienced installerKnow the process
Respond promptlyKeep clock running

Escalation

StageAction
Initial queryDNO customer service
Persistent issueDNO complaints team
UnresolvedEnergy Ombudsman
Regulatory breachOfgem

If escalation reaches the regulator, the body in question is Ofgem – the gas and electricity markets regulator. Their guidance on resolving energy disputes covers the route from supplier or DNO complaint through to the Energy Ombudsman, which handles unresolved cases after eight weeks.

After Approval

What Happens Next

StepTimeline
Accept connection offerWithin validity period
Schedule installationWith installer
Installation proceedsAs planned
CommissioningDay of completion
Final notificationInstaller submits
System generatingImmediately

Documentation to Keep

DocumentWhy Important
Connection offerProof of approval
Acceptance confirmationAgreed terms
Commissioning certificateCompliance evidence
MCS certificateSEG eligibility
DNO reference numberFor future queries

If you ever plan to add more panels to your existing system, your DNO reference number is the starting point for the new application. The DNO will need to know what’s already approved on the connection.

Frequently Asked Questions

Process Questions

QuestionAnswer
Do I contact the DNO myself?No – installer handles it
How do I know which applies?Installer determines
What if application refused?Reduce size or export limit
Can I appeal?Discuss with DNO; options exist

Practical Questions

QuestionAnswer
Does G98 delay installation?No – notification after
Does G99 delay installation?Yes – approval before
What’s an MPAN?Meter Point Admin Number – on bill
Will DNO visit my property?Usually not for residential

Summary

AspectG98 (Small)G99 (Larger)
ProcessNotificationApplication
TimingAfter installationBefore installation
ApprovalNot requiredRequired
TimelineNo delay45-90+ working days
CostFreeUsually free; possible fees
Your involvementMinimalMay need to sign/accept

The DNO approval process ensures that solar installations connect safely to the electricity network. For most residential systems under 3.68kW per phase, this is straightforward – your installer simply notifies the DNO after installation, and no prior approval is needed. This means no delays to your installation timeline.

For larger systems requiring G99 approval, the process takes longer. Applications must be submitted before installation, and the DNO has 45 working days to assess and provide a connection offer. In practice, this often extends to 8-16 weeks, and longer if network constraints exist. Your installer handles the application, responds to queries, and manages the process through to completion.

Understanding the difference helps you make informed decisions about system sizing. Many homeowners choose to stay within G98 limits by using export limiting, allowing larger inverter capacity while capping export to 3.68kW. This avoids G99 delays while still providing full system power for self-consumption and battery charging.

Your MCS installer manages the entire DNO process as a standard part of installation. They know which standard applies, prepare the necessary documentation, submit through the correct channels, and ensure commissioning paperwork is completed. You may need to provide your MPAN number and sign certain documents, but the technical process is handled for you.

Sizing your system around the G98 line. The 3.68 kW per-phase threshold is the single most consequential number in UK domestic solar. A 4 kW or 5 kW inverter triggers G99 with its 6-16 week pre-approval wait, while a 3.68 kW inverter (or a larger one with export limiting set to 3.68 kW) lets you stay G98 and install in days. For most UK homes, an export-limited 5-6 kW system makes more sense than a non-limited 3.68 kW one – you get more generation for self-consumption and battery charging, while the grid-side limit keeps you in G98 territory.

Ask your installer up front: is this G98 or G99, and if it’s G99, what’s the timeline and likelihood of any reinforcement charges in your postcode? An experienced installer will already know the local capacity picture and can flag risks before you commit. Decisions on how many panels and which inverter to fit are best made with the DNO position already understood.